Services

The complete operational
infrastructure for your EPC.

GridReady doesn’t consult. We build and deliver a fully running AI-powered operations system — custom to your territory, your AHJs, your install volume — in 5–7 business days.

Two platforms.
Your entire operation.

We migrate every part of your ops onto two industry-proven platforms and build your complete workflow on top of them.

Platform 01 — JobTread

Project Management Built for Contractors

Replaces spreadsheets, whiteboards, group texts, and disconnected tools with a single source of truth. Every job lives here from POS to PTO closeout.

  • 9-stage workflow from Point of Sale through Closeout and Handover
  • Custom Gantt timeline for every install stage
  • Checklist items and document requirements at each stage gate
  • Full job history, logs, and communications in one record
  • GridReady is an approved JobTread referral partner
Platform 02 — DATAx AI

AI Agents That Run Your Pipeline

Sits on top of JobTread and automates the workflow 24/7. Agents handle every manual touchpoint that currently requires a human with a spreadsheet and a phone.

  • Document collection and homeowner follow-up automation
  • Permit submission tracking and AHJ status monitoring
  • Engineering coordination and survey scheduling
  • Utility interconnection application management
  • PTO checklist verification and closeout automation
  • Commission calculation and daily operations overview

Up to 16 agents running your ops.

Each agent is purpose-built for a specific stage of your pipeline. They run in parallel, around the clock, without sick days or turnover.

Document Collector

Automatically requests and chases required homeowner documents at each stage gate.

ACTIVE 24/7

Permit Tracker

Monitors AHJ submission status and flags incomplete applications before submission.

ACTIVE 24/7

PTO Coordinator

Tracks utility interconnection progress and manages PTO checklist completion.

ACTIVE 24/7

Homeowner Communicator

Sends status updates to homeowners at each stage without manual intervention.

ACTIVE 24/7

Engineering Coordinator

Schedules site surveys, follows up with engineers, tracks stamp delivery timelines.

ACTIVE 24/7

Daily Ops Overview

Generates a daily report of every job in the pipeline with status, blockers, and actions needed.

ACTIVE 24/7

Commission Calculator

Automatically computes installer commissions at PTO based on job closeout data.

ACTIVE 24/7

Exception Handler

Detects stalled jobs, escalates blockers, and routes exceptions to the right person instantly.

ACTIVE 24/7

9 stages. One complete pipeline.

From the moment a contract is signed to the day the system turns on — every step is tracked, every gate is verified, every handoff is automated.

STAGE 01

Point of Sale

Contract signed, job created, onboarding checklist initiated

Automated
STAGE 02

Document Collection

HOA approval, utility bill, roof photos, ID — all chased by agent

Automated
STAGE 03

Site Survey & Engineering

Survey scheduled, engineer assigned, stamp tracked to delivery

Automated
STAGE 04

Permit Submission

AHJ package assembled, submitted complete on first attempt per HB 683

Automated
STAGE 05

Permit Approval

Status tracked daily, corrections handled within 24 hours

Monitored
STAGE 06

Installation

Crew scheduling, material delivery coordination, install checklist

Tracked
STAGE 07

Inspection

Inspection scheduled, passed status confirmed before utility application

Automated
STAGE 08

Utility Interconnection

FPL/Duke/TECO applications submitted, NEM agreement tracked to execution

Automated
STAGE 09

PTO & Closeout

Permission to Operate confirmed, homeowner notified, commission calculated, job closed

Automated

Deep Florida expertise.
Expanding nationally.

GridReady launched in Florida because that’s where the expertise lives — 13 years operating in FPL, Duke Energy Florida, and TECO service territories. The same platform scaling Florida’s most complex permit workflows is built to deploy in every state.

400+

Florida AHJs — each with different permit requirements. No standardized process for small EPCs. We’ve documented the ones that matter to you.

5 days

HB 683 (effective July 2025) mandates permit approval within 5 business days for complete submissions. First-submission accuracy is now a competitive advantage.

3

Utilities — FPL, Duke Energy Florida, and TECO each run separate interconnection processes in parallel with AHJ permitting. We know all three.

● Live Now Currently serving Florida — expanding nationally in 2026.

Ready to see it running on a live job?

Schedule a Demo